: 238–239 Similarly, GATV 5005 performed three orbital maneuvers post-Gemini 10 separation, including adjustments to study temperature effects in varying orbits and executing 1,700 commands, some of which were relayed from Gemini 10. The vehicle was eventually placed in a 220 nmi (410 km 250 mi) circular decay orbit, facilitating its observation during the Gemini 10 mission. This allowed a detailed assessment of its command and communication systems. ![]() Its main engine was fired nine times, and it executed 5,000 commands, surpassing the contractual requirement of 1,000. For instance, GATV 5003, post-separation from Gemini 8, underwent extensive systems testing.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |